Driveways OnlyQBCC LicensedContact Us 24/7

Your new driveway, done properly.

New asphalt driveways for North Brisbane homes. A fixed written quote within 48 hours and a five year workmanship warranty on every job.

QBCC
Licensed contractor
$0M
Public liability cover
0 yr
Workmanship warranty
0 hr
Written quote turnaround

The transformation

Same driveway, one day apart.

Drag the bar. Day one ends at compacted roadbase, string lined and ready. Day two ends with hot mix laid, rolled and done.

Driveway on day one: excavated and compacted roadbase with timber formwork and string lines
The same driveway on day two: finished jet black asphalt with clean edges
Day 1 Roadbase Day 2 Asphalt

What we do

New driveways are the trade, not a sideline.

Brand new wide asphalt double driveway at a brick Queensland home
01

New driveway installation

The whole job, one crew, start to finish. We dig it, base it, edge it and lay it, then walk the finished job with you.

Excavation includedWater shaped away5 year warranty
Price my new driveway
Freshly resurfaced jet black asphalt driveway
02

Resurfacing & overlays

If the bones are good, we lay a fresh surface straight over the top. One day on site and a tired driveway looks brand new.

A fraction of a rebuildSame deep black finishStraight advice first
Price my resurface

The process

Enquiry to driveway, step by step.

Five steps, same order, same crew, every job.

  1. Today

    Enquire

    Call, text photos, or use the form. You deal with Roel direct.

  2. Within 48 hours

    Measure and quote

    We measure on site and put a fixed price in writing.

  3. Days, not months

    Booked in

    Crew, machinery and materials confirmed for your date.

  4. Prep day

    Excavate and base

    Dig, shape and compact the base. This day decides how long it lasts.

  5. Laying day

    Lay, roll, walk through

    Fresh asphalt laid and rolled, then the five year warranty starts.

“Seamless and easy, from the first call to the final walkthrough.”

Pricing, in the open

Straight answers on price.

Your ballpark
$7,300 to $8,800

Typical installed range for 70 m²

Every quote is a fixed price in writing. Want to see it first? Text a photo of your driveway to 0400 000 000 for a free preview in fresh asphalt.

Why ours last

Built to last. Guaranteed in writing.

Completed jet black asphalt driveway sweeping to a modern Australian home
01 The finish

Laid hot, rolled tight. Sharp on day one, solid for twenty years.

02 The base

Crushed rock compacted hard, so it never sinks or cracks.

03 The drainage

Shaped so rain runs to the street, never at your house.

Black on top, solid ground underneath. Our mark is the driveway itself.

The gear and the crew

Owned, not hired.

Modern fleet of asphalt pavers, rollers and tipper trucks lined up at the depot

Every machine on your job is ours: bought, maintained and ready to roll.

All machinery owned in houseThirty years of combined experienceThe same crew quotes it and builds it

Our word

Committed, and contactable 24/7.

No call centres and no run around. Here is what goes in writing on every single quote.

Promise 01
We turn up when we say. Your date is confirmed in writing, and if weather shifts it, you hear from Roel first.
Promise 02
The price is the price. The quote you sign is the number you pay, and nothing extra happens without your sign off.
Promise 03
We leave it cleaner than we found it. Edges trimmed, site swept, waste gone. Only the driveway stays.

“Our word is our bond. You should walk away ecstatic with the job, nothing less.”

Written into every quote and signed by Roel, owner.

Good questions

Asked before, answered straight.

Asphalt typically costs around half as much as concrete, goes down in days rather than weeks, and handles Queensland heat movement without the crack lines concrete needs. Concrete suits decorative finishes. Asphalt suits budgets, timelines and driveways that need to just work for twenty years.

Not quite. Bitumen is the black glue. A "bitumen driveway" usually means bitumen sprayed on the ground with loose stones rolled in, which is the rough finish you see on rural roads. Asphalt is a hot mix of stone and bitumen laid smooth with a machine and rolled tight. We lay asphalt.

It is jet black on handover day, then the Queensland sun settles it to a handsome dark charcoal over the first year. That is normal for every asphalt surface and it does not affect strength at all. A reseal years down the track brings the black right back.

Walk on it the same evening. Drive on it after 48 to 72 hours depending on the weather, cooler is quicker. We leave clear instructions at the walkthrough, including how to avoid scuff marks in the first summer.

15 to 25 years for a properly based residential driveway. The base work decides it, which is why we compact in layers, check falls before laying, and back the workmanship with a five year written warranty.

Yes. Where a crossover or footpath section is involved we tell you exactly what your council requires before we quote, so there are no surprises mid job.

Everything north of Brisbane out to Caboolture: Narangba, North Lakes, Kallangur, Petrie, Strathpine, Albany Creek, Warner, Redcliffe and everywhere in between. Based in Narangba, so most of Moreton Bay is under 30 minutes away.

One step left

Get your fixed quote.

Written quote within 48 hours of the site visit
Fixed price, in writing, before any work starts
No obligation, and no follow up hassle if it is a no
Prefer to talk, or want to text photos? 0400 000 000

Want to talk at 10pm? The chat never sleeps. Contact us 24/7 and we pick it up from there.

About the job

Call Roel Free quote